Repair and Reinforcement of Runway 15-33 and Aircraft Parking Apron — Barcelona Airport
Transportation

Repair and Reinforcement of Runway 15-33 and Aircraft Parking Apron — Barcelona Airport

1999 – 2000

Project sheet

Sector
Transportation
Client
Aeropuerto Anzoátegui, C.A. (A.A.C.A.)
Location
Barcelona, Anzoátegui State, Venezuela
Year
1999 – 2000
Company / Role
Vialpa — Runway and apron repair and reinforcement with P-401 asphalt mix

Project overview

Repair and reinforcement of Runway 15-33 and the commercial aircraft parking aprons at José Antonio Anzoátegui International Airport, carried out under a declared state of emergency (Decree No. 111, May 3, 1999). The contract was signed on November 26, 1999, and completed on February 26, 2000. Works included removing a 15 cm thick asphalt layer with a self-leveling reclaimer machine, sweeping and cleaning, adhesion treatment, paving 245,800 square meters with Asphalt Mix Type P-401 (47,500 tons), and marking the paved areas. Work was performed between 8:30 AM and 6:00 PM Monday to Saturday with Runway 15-33 fully closed; only small aircraft used Runway 02-20.

The Challenge

Repair and reinforce the main runway and parking aprons of an international airport under a declared state of emergency, with a very tight execution window (November 1999 – February 2000) and the need to maintain minimum operability through use of the secondary Runway 02-20 for small aircraft.

Vialpa Scope

Removal of 15 cm asphalt pavement with a self-leveling reclaimer machine; sweeping, cleaning and adhesion treatment; paving of 245,800 m² with 47,500 tons of P-401 asphalt mix; and marking of paved areas, under full closure of Runway 15-33.

Engineering / Construction Approach

Scheduling of Monday-to-Saturday work shifts (8:30 AM–6:00 PM) with Runway 15-33 fully closed, isolating small-aircraft operations on Runway 02-20, and sequential execution of milling, surface preparation, P-401 asphalt placement and marking, within the emergency deadline.

Operational Constraints

Full closure of Runway 15-33 Monday to Saturday (8:30 AM–6:00 PM); exclusive use of Runway 02-20 by small aircraft during the works period; execution under a state of emergency with a three-month contractual deadline.

Technical Highlights

  • Repaving of 245,800 m² with 47,500 tons of P-401 asphalt mix
  • Removal of 15 cm of asphalt pavement with a self-leveling reclaimer machine
  • Execution under a declared state of emergency (Decree No. 111, May 1999)
  • Contract signed November 26, 1999 and completed February 26, 2000

Key Quantities

245.800 m²
Paved area
47.500 Tn (P-401)
Asphalt mix
15 cm
Removed layer
26/02/2000
Completed
1999–2000
Year
A.A.C.A.
Client

Project gallery

Aerial panoramic view of José Antonio Anzoátegui International Airport in Barcelona, showing the rehabilitated Runway 15-33, cross Runway 02-20, commercial aircraft parking aprons, and taxiways
Project image

Aerial panoramic view of José Antonio Anzoátegui International Airport in Barcelona, showing the rehabilitated Runway 15-33, cross Runway 02-20, commercial aircraft parking aprons, and taxiways

Heavy asphalt paver placing the hot-mix wearing course with Type P-401 Asphalt Mix over milled surface, with technical leveling crew verifying thickness and longitudinal joint
Project image

Heavy asphalt paver placing the hot-mix wearing course with Type P-401 Asphalt Mix over milled surface, with technical leveling crew verifying thickness and longitudinal joint

Heavy equipment front operating on the runway: self-leveling reclaimer machine, paver, dump truck, and industrial support compressor during scheduled daytime work window
Project image

Heavy equipment front operating on the runway: self-leveling reclaimer machine, paver, dump truck, and industrial support compressor during scheduled daytime work window

Airport layout plan and strategic road access schematic: interconnection of Barcelona International Airport with Vía La Costanera, Vía Caracas, and Vía Complejo Industrial de Jose
Project image

Airport layout plan and strategic road access schematic: interconnection of Barcelona International Airport with Vía La Costanera, Vía Caracas, and Vía Complejo Industrial de Jose